Welcome to the first surface water quantity report of the Orange-Senqu River Commission (ORASECOM), for the hydrological year 2020-2021. For Read more
Categories
Latest Submission
2020-2021 Orange-Senqu Surface Water Quantity Synoptic Analysis
Khakea-Bray Transboundary Dolomite Aquifer Recharge Assessment
Documentation and Data: A read-only folder structure of all reports, data, and models related to the STAS can be accessed Read more
Improving Groundwater Knowledge in Selected Transboundary Aquifers
Documentation and Data: A read-only folder structure of all reports, data, and models related to this study can be accessed Read more
Stampriet Transboundary Aquifer System (STAS) – Governance of Groundwater Resources in Transboundary Aquifers (GGRETA) Project
Documentation: A read-only folder structure of all reports, data, and models related to the STAS can be accessed from here: Read more
- WIS > WRPM
WRPM
- Author:Bennie Haasbroek
- Post date:27 April, 2016
- Categories:Biota and Ecosystems,Climate,Economy and Society,Infrastructure,Integrated Water Resources Management,Landcover and Use,Policy, Legislation and Strategies,Surface Water Resources,Water Use
Overview The main objectives of this consultancy were to undertake scenario analyses, economic, water requirement projection and ecological support studies to produce the 2014 Orange-Senqu Integrated Water Resources Management Plan (IWRMP). The Project included 5 work packages that are described below. Funding Organisation(s): GIZ WP 4A: Economic Analysis of Water based on Water Accounting for the […]
Read more- TAgs:adaptation to climate change, adaptive capacities, irrigation, IWRM, IWRMP, monitoring environmental flows, natural flow, Phase 3, present ecological state, rainfall. natural runoff, socio-economic, water balance, Water Quality, water quality model, water resource model, water resources planning model, WRPM, WRYM, yield
- Author:Bennie Haasbroek
- Post date:24 October, 2013
- Categories:Climate,Integrated Water Resources Management,Surface Water Resources,Water Use
Objectives to enlarge and improve the existing models to cover the total Orange River Basin and to capacitate representatives of each of the basin states to set up and use the models. Main Activities Assessment of strengths and weaknesses of existing models Extension and expansion of the existing models Assessment of system yields Review the […]
Read more