Latest Submission

2020-2021 Orange-Senqu Surface Water Quantity Synoptic Analysis

Welcome to the first surface water quantity report of the Orange-Senqu River Commission (ORASECOM), for the hydrological year 2020-2021. For Read more

Khakea-Bray Transboundary Dolomite Aquifer Recharge Assessment

Documentation and Data: A read-only folder structure of all reports, data, and models related to the STAS can be accessed Read more

Improving Groundwater Knowledge in Selected Transboundary Aquifers

Documentation and Data: A read-only folder structure of all reports, data, and models related to this study can be accessed Read more

Stampriet Transboundary Aquifer System (STAS) – Governance of Groundwater Resources in Transboundary Aquifers (GGRETA) Project

Documentation: A read-only folder structure of all reports, data, and models related to the STAS can be accessed from here: Read more

IWRMP

Support to Phase 3 of the ORASECOM Basin-wide Integrated Water Resources Management (IWRM) – Plan: Overview

Overview The main objectives of this consultancy were to undertake scenario analyses, economic, water requirement projection and ecological support studies to produce the 2014 Orange-Senqu Integrated Water Resources Management Plan (IWRMP). The Project included 5 work packages that are described below. Funding Organisation(s): GIZ   WP 4A: Economic Analysis of Water based on Water Accounting for the […]

Read more
2014 Integrated Water Resources Management Plan (IWRMP) – Summary and Documents

Purpose: This article will provide an overview of the 2014 IWRMP and provide links to the actual documents Related WIS Articles: 2014 Integrated Water Resources Management Plan – Development and Supporting Studies Reports: ORASECOM, (2015) Integrated Water Resources Management Plan for the Orange-Senqu River Basin – Executive Summary, Report by GIZ for ORASECOM, ORASECOM Report […]

Read more
2014 Integrated Water Resources Management Plan (IWRMP) – Development and Supporting Studies

  Introduction This article outlines the aims and objectives of the basin-wide Integrated Water Resources Management (IWRM) Plan development  as well as how the work would be carried out through a combination of consolidation of technical studies and stakeholder consultation. During the development of the IWRM Plan it is ensured that the key basic elements are […]

Read more
Support to Phase 2 of the ORASECOM Basin-wide Integrated Water Resources Management (IWRM) – Plan: Overview

Overview The main objectives of this consultancy were to enlarge and improve the existing models for the Orange-Senqu Basin, so that they incorporated all of the essential components in the four Basin States and are accepted by each Basin State. These models must be capable of providing the current and likely future information needs of […]

Read more